Javascript must be enabled to use all features of this site and to avoid misfunctions
Prime Tower vs. 23 Marina - Comparison of sizes
HOME
Select category:
Buildings
Select category
NEW

Cancel

Search in
Close

23 Marina


Height: 393m
Location: Dubai
Year: 2012
23 Marina

Prime Tower


Height: 126m
Location: Zurich
Year: 2011
Prime Tower

Prime Tower vs 23 Marina


Prime Tower
23 Marina
Change

Prime Tower

Prime Tower

Height

126m
Floors36
Year2011
CityZurich

Informations

The Prime Tower, also called'Maag-Tower' in a previous stage of preparation, is a skyscraper in Zurich, Switzerland. At a height of 126 metres (413 feet ), it was the highest skyscraper in Switzerland from 2011 until 2015, when the Roche Tower at Basel (standing at 178 metres (584 feet )) was finished. The building is situated near the Hardbrücke railway station. The tower replaces an industrial facility that's been demolished. According to its developers, the tower's construction, which took 15 years to plan and execute, was a financial success, with its valuation based on rental rates exceeding the building cost by CHF 110 million.



The tower and its two companion buildings, Cubus and Diagonal, are used primarily as office buildings. Due to its opening in December 2011, the tower hosts the'Clouds' restaurant on its top floor, a conference center, the Hotel Rivington & Sons on the ground floor, in addition to the offices of Deutsche Bank Schweiz, Homburger AG, Transammonia, Korn/Ferry International, Citibank Switzerland, Infosys, Repower AG, Ernst & Young, Zürcher Kantonalbank and consulting firms.

Source: Wikipedia
Change

23 Marina

23 Marina

Height

393m
Floors90
Year2012
CityDubai

Informations

23 Marina is an 88-story, 392.8 m (1,289 ft) residential skyscraper in Dubai, United Arab Emirates. It was the world's tallest all-residential building until the completion of the neighboring Princess Tower. The tower has 57 swimming pools and every duplex at the tower is equipped with its own private elevator. The building was 79 percent sold before construction began. The raft was completed on 30 April 2007.

Source: Wikipedia

More intresting stuff