Javascript must be enabled to use all features of this site and to avoid misfunctions
Macau Tower vs. Prime Tower - Comparison of sizes
HOME
Select category:
Buildings
Select category
NEW

Cancel

Search in
Close

Prime Tower


Height: 126m
Location: Zurich
Year: 2011
Prime Tower

Macau Tower


Height: 338m
Location: Sé, Macau
Year: 2001
Macau Tower

Macau Tower vs Prime Tower


Macau Tower
Prime Tower
Change

Macau Tower

Macau Tower

Height

338m
Floors63
Year2001
CitySé, Macau

Informations

Macau Tower Convention & Entertainment Centre (Chinese: ???????????; Portuguese: Centro de Convenções e Entretenimento da Torre de Macau), also called Macau Tower (Chinese: ???; Jyutping: ou3 mun4*two taap3; Portuguese: Torre de Macau), is a tower located in Sé, Macau. The tower measures 338 m (1,109 ft) in height from ground level to the maximum point. Its observation deck includes views, restaurants, theatres, shopping malls and the Skywalk X, a walking tour around the outer rim. It offers the best view of Macau and lately has been used for a variety of adventurous activities.



At 233 metres, the Macau Tower's tethered'skyjump' and Bungee jump by AJ Hackett in the tower's outer rim, is the highest commercial skyjump on earth (233 metres), and the second highest commercial decelerator descent facility in the world, after Vegas' Stratosphere skyjump at 252 metres.The tower was created by Moller Architects and is one of the members of the World Federation of Great Towers. Beyond observation and amusement, the tower can also be used for telecommunications and broadcasting. The Grand Lisboa hotel are the most recognizable landmarks in the Macau skyline.

Source: Wikipedia
Change

Prime Tower

Prime Tower

Height

126m
Floors36
Year2011
CityZurich

Informations

The Prime Tower, also called'Maag-Tower' in a previous stage of preparation, is a skyscraper in Zurich, Switzerland. At a height of 126 metres (413 feet ), it was the highest skyscraper in Switzerland from 2011 until 2015, when the Roche Tower at Basel (standing at 178 metres (584 feet )) was finished. The building is situated near the Hardbrücke railway station. The tower replaces an industrial facility that's been demolished. According to its developers, the tower's construction, which took 15 years to plan and execute, was a financial success, with its valuation based on rental rates exceeding the building cost by CHF 110 million.The tower and its two companion buildings, Cubus and Diagonal, are used primarily as office buildings. Due to its opening in December 2011, the tower hosts the'Clouds' restaurant on its top floor, a conference center, the Hotel Rivington & Sons on the ground floor, in addition to the offices of Deutsche Bank Schweiz, Homburger AG, Transammonia, Korn/Ferry International, Citibank Switzerland, Infosys, Repower AG, Ernst & Young, Zürcher Kantonalbank and consulting firms.

Source: Wikipedia

More intresting stuff