Javascript must be enabled to use all features of this site and to avoid misfunctions
Tornado Tower vs. Prime Tower - Comparison of sizes
HOME
Select category:
Buildings
Select category
NEW

Location DohaZurich

Cancel

Search in
Close

Tornado Tower


Height: 200m
Location: Doha
Year: 2008
Tornado Tower

Prime Tower


Height: 126m
Location: Zurich
Year: 2011
Prime Tower

Tornado Tower vs Prime Tower


Tornado Tower
Prime Tower
Change

Tornado Tower

Tornado Tower

Height

200m
Floors51
Year2008
CityDoha

Informations

The Tornado Tower, also known as the QIPCO Tower, is a high tech office skyscraper in the city of Doha, Qatar. The building stands at a height of 640 feet (195 m) tall with 52 floors. Construction began in 2006 and has been completed in 2008. It's located on a 199,000 square foot plot of land, but only occupies 32,300 square feet of it, leaving plenty of open space around it to improve its aesthetic. The circular footprint of the building, using a 97-foot diameter at its base, includes a ground level restaurant and a bank, among other amenities. Sixteen elevators serve the approximate 904,000 square feet of office space the building contains.



The building is accompanied by 1500 automobile parking spaces housed within three levels of underground basement parking. Due to the hour glass shape of the building, the total rentable office space available on each floor varies from 13,560--25,800 square feet. This provides high flexibility in both the size of office space available and the design of office space on each floor. The top three floors of the tower are luxury office space and are surrounded by terraces and balconies. The top level of the VIP floors has direct access to a helicopter landing pad. It's the tenth largest building in the city of Doha.

Source: Wikipedia
Change

Prime Tower

Prime Tower

Height

126m
Floors36
Year2011
CityZurich

Informations

The Prime Tower, also called'Maag-Tower' in a previous stage of preparation, is a skyscraper in Zurich, Switzerland. At a height of 126 metres (413 feet ), it was the highest skyscraper in Switzerland from 2011 until 2015, when the Roche Tower at Basel (standing at 178 metres (584 feet )) was finished. The building is situated near the Hardbrücke railway station. The tower replaces an industrial facility that's been demolished. According to its developers, the tower's construction, which took 15 years to plan and execute, was a financial success, with its valuation based on rental rates exceeding the building cost by CHF 110 million.The tower and its two companion buildings, Cubus and Diagonal, are used primarily as office buildings. Due to its opening in December 2011, the tower hosts the'Clouds' restaurant on its top floor, a conference center, the Hotel Rivington & Sons on the ground floor, in addition to the offices of Deutsche Bank Schweiz, Homburger AG, Transammonia, Korn/Ferry International, Citibank Switzerland, Infosys, Repower AG, Ernst & Young, Zürcher Kantonalbank and consulting firms.

Source: Wikipedia

More intresting stuff